Calle JoaquinRoadway extension, including cement soil stabilization, demolition, grading, installation of base, and paving for road realignment. Iris Hills DevelopmentInstallation of underground utilities including water, sewer and storm drain; detention basin; site earthwork and soil stabilization. Union Valley ParkwayConstruction of a new 1,267 meter, two lane roadway that connects Blosser Road with Phase I of the Union Valley Parkway project. The project includes roadway construction, street lighting, traffic control, traffic stripes and pavement markings, new landscape and bioswales, tree removal, construction of masonry walls, water system modification and under roadway drainage culverts. |
|
RETIREMENT COMMUNITY
John Madonna is proposing a 342-unit retirement community, including a skilled nursing facility, on 111 acres along the southwestern edge of San Luis Obispo.
HWY 1 LANDSLIDE